warehouse traffic management, warehouse traffic management plan, site traffic plan, yard traffic safety

Guide · Operations

Warehouse traffic management plan

Short answer

A warehouse traffic management plan maps every vehicle and pedestrian route, sets speed zones, limits crossings and assigns a physical control to each conflict point. Speed bumps go at the gate, the yard entry, before each crossing and roughly every 150–250 ft on long yard roads.

Six steps to build the plan

Walk the site with a map; mark each step on it.

StepWhat to doOutput
1. MapDraw routes for trucks, forklifts, cars, peopleSite map
2. SeparateOne-way loops, walkways, barriersRoute plan
3. Zone speedsSet limits per areaSpeed zones
4. Control pointsGate, yard entry, crossings, long roadsSpeed bump count
5. Sign & markStop lines, crossings, speed signsSignage list
6. ReviewAfter changes, incidents, near missesReview date

Turning control points into a quote

Count the lanes at each control point and their widths. That count is your order: send it with delivery ZIPs and target date and we return one quote per site.

Buying terms

  • In stock in the USA — LTL freight to all 48 contiguous states.
  • Purchase orders accepted from companies, 3PLs, HOAs, school districts and cities.
  • Pallet and container pricing past about 10 lanes.
  • Anchor hardware and end caps included; 5-year commercial warranty.
  • Quote with landed freight answered within 24 business hours.

Frequently asked

What is a warehouse traffic management plan?

A written layout of how vehicles and people move around the site: routes, one-way systems, speed limits, crossings, parking, signage and physical controls, reviewed on a schedule.

What should it include?

A site map, vehicle and pedestrian routes, speed zones, crossing points, loading and parking areas, the physical controls at each point (barriers, speed bumps, mirrors), signage and a review date.

Where do speed bumps go in the plan?

At the gate, the yard entry, before each pedestrian crossing and every 150–250 ft on long yard roads. Use the 2.4 in heavy-duty profile where trucks run.

How often should it be reviewed?

Whenever the layout, volume or shift pattern changes, and after any incident or near miss. Many sites also schedule an annual review.

How much does the speed control part cost?

$360–$660 per 12 ft lane for heavy-duty bumps and $260–$520 for modular car-lane bumps, plus freight. Count your control points and we quote in 24 hours.

Free download

Spec sheet & price guide (PDF)

Both profiles, dimensions, load rating, price per 12 ft lane and what we need to quote freight. One field — no phone call required.

Request pricing

Get your landed price in 24 hours

No spam. Pricing, freight and lead time only.

Prefer to talk it through? Open the full quote form.

WhatsApp